CC Resolution No. 9800RESOLUTION NO. 9800
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
APPROVING THE FINAL PLAN FOR THE IMPROVEMENT OF FRONTAGE
LOCATED AT 10160 CAMINO VISTA DRIVE, APN 342-04-059; DEVELOPER
SHYH HUNG YINN; AUTHORIZING THE CITY ENGINEER TO SIGN THE
FINAL PLAN; AUTHORIZING EXECUTION OF AGREEMENT
IN CONNECTION THEREWITH
WHEREAS, there has been presented to the City Council for approval of the final
plan for the improvement of street frontage located at 10150 Camino Vista Drive by Shyh
Hung Yinn; and
WHEREAS, there has been presented to the City Council a proposed agreement
for the construction of streets, curbs, gutters, sidewalks and for other improvements, and
good and sufficient bonds, fees, and deposits as set forth in Exhibit "A" having been
presented for the faithful performance of said work and the carrying out of said
agreement; and said map, agreement, and bonds having been approved by the City
Attorney;
NOW, THEREFORE, BE IT RESOLVED THAT said final plan for the
improvement of street frontage at 10160 Camino Vista Drive be and the same is hereby
approved; and the City Engineer and the City Clerk are hereby authorized to sign said
final plan; and the Mayor and the City Clerk are hereby authorized to execute the
agreement herein referred to on behalf of the City of Cupertino.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this 3rd day of March, 1997, by the following vote:
Vote
Members o__f the City
AYES: Burnett,
NOES: None
ABSENT: None
ABSTAIN: None
Chang, Dean,
Sorensen, Bautista
ATTEST:
APPROVED:
~o;, City of ~p~r~t} -
Resolution No. 9800
Page 2
EXHIBIT "A"
SCHEDULE OF BOND, FEES, AND DEPOSITS
DEVELOPMENT: Single-Family Homes
Shyh Hung Yinn
LOCATION: 10160 Camino Vista Drive
A. Faithful Performance Bond: $6,184.20
SIX THOUSAND ONE HUNDRED EIGHTY-FOUR AND 20/100 DOLLARS
B. Labor and Material Bond: $6,184.20
SIX THOUSAND ONE HUNDRED EIGHTY-FOUR AND 20/100 DOLLARS
C. Checking and Inspection Fees:
TWO HUNDRED SIXTY-SIX AND 00/100 DOLLARS
D. Indirect City Expenses:
E. Development Maintenance Deposit:
F. Storm Drainage Fee: Basin #2
TWO HUNDRED EIGHTY-FOUR AND 00/100 DOLLARS
Go
H.
I.
J.
K°
One Year Power Cost:
Street Trees:
Map Checking Fee:
Park Fee: Zone II
Acct # 480-416-011
Water Main Reimbursement:
Maps and/or Improvement Plans:
$ 266.00
N/A
N/A
$ 284.00
N/A
By Developer
N/A
N/A
N/A
As specified in
Item #23 of agreement