Loading...
BLD-2021-1441_Job CardCITY OF CUPERTINO - BUILDING DIVISION 10300 TORRE AVENUE CUPERTINO, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG/ACCELA JOB CARD THIS CARD MUST BE POSTED AT A LOCATION VISIBLE FROM THE STREET FRONTAGE ON SITE OF THE STRUCTURE BEING PERMITTED AND IS NOT TO BE REMOVED UNTIL BUILDING FINAL. A HARD-COPY OF THE APPROVED PLANS AND DOCUMENTS SHALL BE KEPT AT THE SITE OF WORK. Permit No: BLD-2021-1441 Issued Date: 08/06/2021 Building Address: 10451 SCENIC CIR Cupertino Contractor: TESLA ENERGY OPERATIONS INC Job Description: INSTALL 24 PANEL ROOF MOUNTED PV SYSTEM - (8.16 KW); (2) ENERGY STORAGE SYSTEM - (27 KW); NEW DISTRIBUTION PANEL - (225 AMP) REV#1- RELOCATE EQUIPMENT TO EXTERIOR PATIO - APPROVED 10/7/2021 REV #2 - REVISE PV SYSTEM TO 21-PANEL ROOM MOUNTED SYSTEM - (8.4 KW) WITH NEW LAYOUT; THREE LINE DIAGRAM UPDATED; BACKUP SWITCH REPLACED WITH BACKUP GATEWAY; SITE PLAN PALCARD ADJUSTED - APPROVED 08/03/2022 EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED. *PLEASE REFER TO QR CODE FOR ANY REVISIONS OR UPDATED INFORMATION CITY OF CUPERTINO - BUILDING DIVISION 10300 TORRE AVENUE CUPERTINO, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG/ACCELA JOB CARD THIS CARD MUST BE POSTED AT A LOCATION VISIBLE FROM THE STREET FRONTAGE ON SITE OF THE STRUCTURE BEING PERMITTED AND IS NOT TO BE REMOVED UNTIL BUILDING FINAL. A HARD-COPY OF THE APPROVED PLANS AND DOCUMENTS SHALL BE KEPT AT THE SITE OF WORK. Permit No: BLD-2021-1441 Issued Date: 08/06/2021 Building Address: 10451 SCENIC CIR Cupertino Contractor: TESLA ENERGY OPERATIONS INC Job Description: INSTALL 24 PANEL ROOF MOUNTED PV SYSTEM - (8.16 KW); (2) ENERGY STORAGE SYSTEM - (27 KW); NEW DISTRIBUTION PANEL - (225 AMP) REV#1- RELOCATE EQUIPMENT TO EXTERIOR PATIO - APPROVED 10/7/2021 EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED. *PLEASE REFER TO QR CODE FOR ANY REVISIONS OR UPDATED INFORMATION