Loading...
02-012 Simon Martin-Vegue Winkelstein Moris. i ~ .~. d .; FIRST AMENDMENT TO CONSULTANT AGREEMENT BETWEEN THE CITY OF CUPERTINO AND SIMON MARTIN-VEGUE WINKELSTEIN ~IIORIS, A CALIFORNIA CORPORATION FOR ARCHITECTURAL PLANNING AND DESIGN SERVICES FOR THE CUPERTINO LIBRARY, CIVIC CENTER AND CIVIC PLAZA THIS FIRST AMENDMENT TO AGREEMENT is made and entered into this `- day of Ma-wC}~ 2002 by and between the Cll-Y OF CUPERTINO, a municipal corporation (hereinafter "CITY"), and SIMON MARTIN-V1=GUE WINKELSTEIN MORIS, a California Corporation (hereinafter "CONSULTANT"). RECITALS WHEREAS, on June 12, 2001, CITY and CONSULTANT entered into an agreement entitled "AGREEMENT FOR ARCHITECTURAL CONSULTANT SERVICES BETWEEN THE CITY OF CUPERTINO AND SIMON MARTIN-VEGUE WINKELSTEIN MORIS, A CALIFORNIA CORPORATION FOR NEW CUPERTINO LIBRARY"; and WHEREAS, CITY and CONSULTANT desire to amend the AGREEMENT to modify the basic agreement, scope of services, and increase the t~~tal compensation; and WHEREAS, the CITY OF CUPERTINO desires to obtain architectural consultant services for the combined Cupertino Library, Civic Center and Civic Plaza, (hereinafter, PROJECT); and WHEREAS, Simon Martin-Vegue Winkelstein Moris has the necessary professional expertise and skills to perform the architectural services required, FIRST AMENDti1ENT -page 1 NOW, THEREFORE, the purpose of this FIRST i~MENDMENT to the AGREEMENT is to retain Simon Martin-Vegue Winkelstein Moris as CONSULTANT TO THE CITY to perform those services specified in REVISED EXHIBIT A of this FIRST AMENDMENT. SECTION 1. SECTION 4, "COMPENSATION" is amended as follows: "The compensation to be paid to CONSULTANT, including payment for Basic Professional Services, Reimbursable Expenses and Additional Services shall not exceed the amount of Two Million Six Hundred Twelve Thousand and 00,100 DOLLARS ($2,612,000). The rate and schedule of payment is set out in REVISED EXI-IIBIT C, entitled "COMPENSATION", which is attached hereto and incorporated herein." SECTION 2. SECTION 8, "PROJECT COORDIf~IATION" (a) CITY. The City Manager shall be representative of CITY for all purposes under this FIRST AMENDMENT. Ralph A. Qualls, Jr., Director of Public Works, is hereby designated as the CITY's PROJECT DIRECTOR. Terry W. Greene, Senior Architect of Public Works, is hereby designated as the CITY's PROJECT MANAGER for the Department of Public Works, rind shall supervise the progress and execution of this FIRST AMENDMENT. (b) CONSULTANT. CONSULTANT shell assign a single PROJECT DIRECTOR to have overall responsibility for thE~ progress and execution of this FIRST AMENDMENT for CONSULTANT. IVlichael Bernard is hereby designated as the PROJECT DIRECTOR for CONSULTANT. Should circumstances or conditions subsequent to the execution of this FIRST AMENDMENT require a substitute PROJECT DIRECTOR for any reason, the PROJECTOR DIRECTOR designee shall be subject to the prior written accept<<nce and approval of the CITY, which shall not be unreasonably withheld. FIRST AMENDti1ENT -page 2 SECTION 3. SECTION 22, "NOTICES" All notices and other communications required or permitted to be given under this FIRST AMENDMENT to the AGREEMENT shall be in writing and shall be personally served or mailed, postage prepaid and return receipt requested, addressed to the respective parties as follows: To CITY: Terry W. Greene Project ManagE~r City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 To CONSULTANT: Michael Bernard Project Director Simon Martin-V'egue Winkelstein Moris 989 Market St., 3~d Floor San Francisco, CA 94103 Notice shall be deemed effective on the date per:~onally delivered or, if mailed, three (3) days after deposit in the mail. SECTION 4. All of the terms and conditions of the original AGREEMENT not modified by this First Amendment shall remain in full force and effect. FIRST AMENDNIENT -page 3 WITNESS THE EXECUTION HEREOF on the d~iy and year first herein above written. APPROVED AS,TO 50R By: Killian, ager ~~>(/~. Date 3 _lo ~d ~- Smith, City Clerk 10300 Torre Avenue Cupertino, CA 95014 Telephone: (408) 777-3223 NOTARY PUBLIC CERTIFICATION (SEAL) State of California ~ ~' County of Sari .~k•~ T / ~ l1. G Jy p~ On ~/ / ore me, ~ ~~~~ Not Pu I'c, personal) appeared /~ "CITY" "CONSULTANT" SIMON MARTIN-VEGUE WINKELSTEIN MORIS, a C~~lifornia Corporation B~~: N~~me: Anthony Bernheim Tulle: Vice President 9>:i9 Market Street, 3`d Floor Spin Francisco, California 94103 Telephone: (415) 546 0400 known to me(or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their Permitted capacity(ies), and that by his/her/their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my and and official seal. 5. O. KISH Commission # 1297207 - ~ Signature o Not ry Public z `° Notary Public - Califoml0 San Francisco County -- My Comm. E~ires Apr 10, 200.5 nicipal corporation ~~ Date S.G_o2. FIRST AMENDMENT -page 4 REVISED EXHIBIT A SCOPE 01= SERVICES CONSULTANT shall provide Programming, Concept Development, Schematic Design, Design Development, Construction Documents, Biddirn~, and Contract Award services on the PROJECT, in a such a manner as to enable the CITY to advertise for bids for a single project with a single contractor. CONSULTANT shall assist the CITY in its coorclination of PROJECT design work with other consultants providing services to CITY under separate agreements. Separate agreements with the CITY, for professional services by other consultants, collectively referred to as CITY'S CONSULTANTS, for this FIRST AMENDMENT, are as follows: • Geotechnical Services provided by Treaclwell & Rollo • Site Survey Services provided by Nelson Engineering • Architectural Design Services provided b~,r Thomas R. Aidala, Programming through Construction Documents Phase • Landscape Design Services provided by Hargreaves Associates, Concept Design and Schematic Design Phase • Construction Management Services provided by Nova Partners, Programming through Contract Award Phase • Audio and Video System Design provided by VMI Broadcast and Video CONSULTANT shall not be responsible for the ~~erformance or payment of CITY'S CONSULTANTS. Furthermore, CITY will include the following indemnity provision, or its equivalent, in each and every agreement with the CITY'S CONSULTANTS, executed after the date of execution of this FIRST AMENDMENT, `CITY'S CONSULTANT agrees to indemnify, defend and hold the CITY and SIMON MARTIN-VEGUE WINKELSTEIN MORIS, A CALIFORNIA CORPORATION, including its owners, employees, agents, and representatives, harmless from and against any and all claims, suits, demands, losses and expenses, including reasonable attorneys' fees, accruing or resulting or arising out of the actual or alleged negligent Revised f=xhibit A - 1 REVISED EXHIBIT A SCOPE 01= SERVICES performance or non-performance of the CITY'S CONSULTANT'S obligations under this AGREEMENT or otherwise arising out of the CITTY'S CONSULTANT'S actual or alleged errors or omissions". Nothing contained in the above described provi:>ion, affects in any way the primary obligation of the CONSULTANT, including the provisions of ;section 10 Indemnification, contained in the AGREEMENT FOR ARCHITECTURAL CONSUiLTANT SERVICES BETWEEN THE CITY OF CUPERTINO AND SIMON MARTIN-VEGUE W INKELSTEIN MORIS, or any amendments thereto. Upon completion of the Schematic Design Phase, CONSULTANT shall contract with Hargreaves Associates for Landscape Design services for tf~e remainder of the scope of this FIRST AMENDMENT. Fees for Landscape Design services are included in this FIRST AMENDMENT. The PROJECT is located on CITY owned property on the east side of Torre Avenue between Rodrigues Drive and Pacifica Drive in the City off Cupertino, California. SECTION 1.GENERAL: The PROJECT, originally consisting of the CupE~rtino Library, has been expanded to include a Civic Center and Civic Plaza. The PROJECT Construction Budget is increased in this FIRST AMENDMENT to $19,600,000, and includes co:~ts for Demolition, General Conditions, Special Conditions, Profit, Overhead, Design Contingern~y, Construction Contingency and Escalation to the mid-point of construction. CONSULTANT shall design to the construction (budget and reconcile CONSULTANT Statements of Probable Cost with CITY provided independent Cost Estimates at each formal design phase. Revised E=xhibit A - 2 REVISED EXHIBIT C COMPENSATION This REVISED EXHIBIT C, COMPENSATION, replaces EXHIBIT C, COMPENSATION, in the AGREEMENT. BASIC PROFESSIONAL SERVICE CITY agrees to compensate CONSULTANT for Basic Professional Services performed in accordance with the terms and conditions of this FIRST AMENDMENT. The scheduled amount of compensation to be paid to CONSULTANT for Basic Professional Services under this FIRST AMENDMENT is Two Million, One Hundred Eighty-Five Thousand, Six Hundred Seventeen and 00/100 dollars ($2,185,617). The scheduled allowance for compensation to be paid to CONSULTANT for Reimbursable Expenses is One Hundred Eight Thousand and 00/100 Dollars ($108,000). The allowance for compensation to be paid to CONSULTANT for Additional Services is Three Hundred Eighteen Thousand, Three Hundred Eighty-Three and 00/100 Dollars ($318,383). Any hours worked or expenses incurred, which would result in exceeding the combined maximum amount of compensation set forth herein, shall be at no cost to CITY. Service Phase Total Pro ram Develo ment $142,026 Conce t Develo ment $310,429 Sub Total $452,455 Schematic Desi n $240,517 Desi n Develo ment $492,830 Construction Documents $960,065 Biddin & Award $39,750 Construction Contract Administration $0 Sub Total $1,733,162 Services Total $2,185,617 Revised Exhibit C-1 REVISED EXHIBIT C COMPENSATION Reimbursable Ex ense Allowance $108,000 Additional Services Allowance $318,383 Pro'ect Total $2,612,000 The CONSULTANT assigns the following fees t~~ the following tasks: ASP 001 Urban Analysis and Site Selection ASP 002 Civic Center Pre-design & Progr<~mming ASP 003 not used at this time ASP 004 Presentation Model ASP 005 Library Program Reduction ASP 006 Civic Center Concept DevelopmE~nt ASP 007 Library Footprint Adjustment $37,200 $73,826 $0 $10,000 $11,000 $170,159 $20,000 The CITY Public Works Director may approve, in writing, the transfer of budget amounts between any of the phases of Basic Professional Services or between the categories of Basic Professional Services, Reimbursable Expense: and Additional Services, provided that the total FIRST AMENDMENT amount does not exceed Two Million, Six Hundred Twelve Thousand and 00/100 Dollars ($2, 612,000). ADDITIONAL SERVICES CONSULTANT will be compensated for Additi~~nal Services, only by prior written authorization, by Additional Service Directive, by the Director of Public Works, or his authorized representative, on a "Time and Materials" or "Lump Sum" basis. For work performed as "Time and Materials", CONSULTANT shall submit invoices withrime allocations and back-up information, for CONSULTANTS's design staff and CONSULTA,NT's Sub-consultants, to the CITY for approval. Revised Exhibit C-2 REVISED EXHIBIT C COMPENSATION Where the work is to be performed as ~i "Lump Sum", CITY agrees to compensate CONSULTANT monthly based upon a perceni:age of work completed, plus reimbursement for Reimbursable Expenses. Where the work is to be performed on a "Time ~~nd Materials" basis, CITY agrees to compensate CONSULTANT monthly based upon the hourly ~~ates in REVISED EXHIBIT D, BILLING RATES. CONSULTANT shall be responsible for directing the work of sub-consultants and for any compensation due to sub-consultants. CITY assumes no responsibility whatsoever concerning such compensation. REIMBURSABLE EXPENSES CONSULTANT shall be authorized reimbursement for the below listed expenses directly related to the performance of Basic Professional Services and Additional Services, provided in this FIRST AMENDMENT. • Reproduction of Drawings and Spc~cifications • Private Auto Parking, Tolls, and Travel at 34'/2 cents per mile • Commercial Auto Travel • Commercial Air Travel • Meals and Lodging • Presentation materials (excluding models and artist's original renderings, which shall be considered and compens~~ted as an Additional Service) • Project related materials, supplies or equipment CONSULTANT shall be entitled to a 10% markup of direct, authorized, Reimbursable expenses. CONSULTANT shall provide clearly legible, datc~d backup documentation annotated with purpose and service phase of all Reimbursable expenses. Revised Exhibit C-3 REVISED EXHIBIT D BILLINIa RATES (All rates indicated shall be in effect until June 30, 2002) 1. Architect: SMWM 989 Market St., 3~d Floor San Francisco, CA 94103 415.546.0400 SMWM RATE SCHEDULE Principal $210.00/hr Associate Principal $175.00 Director of Interior Design $165.00 Senior Associate/Senior Contract Administrator $150.00 Senior Associate/Senior Project Architect $150.00 Senior Associate/Senior Project Planner $150.00 Senior Associate/Senior Project Designer $150.00 Senior Associate/Senior Project Manager $150.00 Project Manager/ Project Architect $125.00 Project Designer/ Project Planner $125.00 Director of Graphic Design $125.00 Senior Designer/Drafter/Planner $100.00 Intermediate Designer/Drafter,~Planner $85.00 Intermediate Graphic Designer $85.00 Designer/Drafter/Planner $70.00 Project Assistant $50.00 2. Structural Engineer: Forell Elsesser Engineers 160 Pine Street San Francisco, CA 94111 415.837.0700 FORELL ELSESSER RATE SCHEDULE Senior Principal $150-170.00/hr Principal $140.00 Senior Engineer $115-130.00 Engineer $90-105.00 CAD Manager $95.00 CAD Drafter $75-85.00 3. Mechanical, Electrical Plumbing, Fire Protection Engineer, Telecommunications: Flack + Kurtz, Inc. 343 Sansome St., Suite 450 San Francisco, CA 94111 415.433.5311 FLACK + KURTZ RATE SCHE=DULE Senior Vice President $225.00/hr Vice President $190.00 Senior Associate $160.00 Revised Exhibit D-1 REVISED EXHIBIT D BILLINIa RATES (All rates indicated shall be in effect until June 30, 2002) Associate $140.00 Engineer $125.00 Design Engineer $100.00 Designer $90.00 CAD Operator $85.00 Administration $65.00 Director of Lighting Design Services $175.00 CAD Manager $125.00 4. Civil Engineer: Sandis Humber Jones 605 Castro Street Mountain View, CA 94041-2011 650.969.6900 SANDIS HUMBER JONES R~~TE SCHEDULE Principal $180.00/hr Senior Engineer $125.00 Project Engineer-Level III $110.00 Project Engineer-Level II $95.00 Project Engineer-Level I $85.00 Design Engineer-Level III $85.00 Design Engineer-Level II $75.00 Design Engineer-Level I $60.00 Computer/Engineering Technician-Level III $85.00 Computer/Engineering Technician-Level II $70.00 Computer/Engineering Technician-Level I $50.00 Clerical $40.00 5. Landscape Architect: Hargreaves Associates 2020 17th St San Francisco, CA 94103 415.865.1811 HARGREAVES RATE SCHEDULE Principal/Project Manager $200.00/hr Project Landscape Architect $160.00 Senior Associate /Associate $125.00 Staff $110.00 Clerical/Administrative $70.00 6. Code Consultant: Rolf Jensen & Associates 2125 Oak Grove Rd., Suite 300 Walnut Creek, CA 94598-253Sa 925.938.3550 ROLF JENSEN & ASSOCIATI.S RATE SCHEDULE Principal $165.00/hr Revised Exhibit D-2 REVISED EXHIBIT D BILLING RATES (All rates indicated shall be in effect until June 30, 2002) Project Manager $130.00 Associate Engineer $120.00 Assistant Engineer $115.00 Technician $100.00 7. Lighting Designer: Architectural Lighting Design 370 Brannan Street San Francisco, CA 94107 415.495.4085 ARCHITECTURAL LIGHTING. DESIGN RATE SCHEDULE Principal $140.00/hr Designer $110.00 Technical Staff $80.00 8. Specifications Writer: John Raeber, FAIA, FSCI, CCS 75 Seward Street San Francisco, CA 94114 415.864.2260 JOHN RAEBER RATE SCHEDULE Principal $150.00/hr 9. Hardware Consultant: Door + Hardware Consultants 388 Market Street San Francisco, CA 94111 415.623.2744 DOOR + HARDWARE CONSULTANTS RATE SCHEDULE Principal $125.00/hr Technical Level I $85.00 Technical Level II $55.00 Technical Level III $35.00 10. Acoustical Consultant: Charles Salter Associates, Inc. 130 Sutter Street San Francisco, CA 94104 415.397.0422 CHARLES SALTER ASSOCI~~TES RATE SCHEDULE President, Sr. Vice-President, Vice President, Director $185.00/hr Principal Consultant $160.00 Senior Consultant $125.00 Consultant $110.00 Technical Assistant $75.00 Revised Exhibit D-3