Loading...
09-154 Sterling Barnhart Park Elite Landscaping Inc.APPROVI Project No. 2008-9126 ~~ ~~ DOCUP~IENT 00520 ~~ ~ ~~ ~..®/~~ p~~ EST CO ES J f~ v C Old"TRACT ~~~3v THIS C CT, dated this w' -day of ~tt~~~[, 2009 , by and between Elite Landscaping Inc., whose place of business is located at 2972 Larkin Avenue, Clovis, CA 93612 ("Contractor"), and the CITY OF CUPERTINO, a Municipal Corporation of the State of California ("City") acting under and by virtue of the authority vested in the City by the laws of the State of California. WHEREAS, City, on the 30th day of November, 2009 awarded to Contractor the following Project: PROJECT NUMBER 2008 - 9126 STERLING B.~RNHART PARK NOW, THEREFORE, in consideration of the mutual covenants hereinafter set forth, Contractor and City agree as follows: Article 1. Work 1.1 Contractor shall complete all Work specified in the Contract Documents, in accordance with the Specifications, Drawings, and all other terms and conditions of the Contract Documents. Article 2. Agency and Notices to City 2.1 City has designated Terry Greene, City Architect, to act as City's Authorized Representative(s), who will represent City in performing City's duties and responsibilities and exercising City's rights and authorities in Contract Documents. City may change the individual(s) acting as City's Authorized Representative(s), or delegate one or more specific fiunctions to one or more specific City's Representatives, including without limitation engineering, architectural, inspection and general adnzinistra*.ive functions, at any time with notice and without liability to Contractor. Each City's Representative is the beneficiary of all Contractor obligations to City, including without limitation, all releases and indemnities. 2.2 City has designated SSA Landscape Architects, [nc. to act as Consulting Engineer. City may change the identity of the Consulting Engineer at any time with notice and without liability to Contractor. 2.3 All notices or demands to City under the Contract Documents shall be to City's Authorized Representative at: 10300 Torre Avenue, Cupertino, California 95014 or to such other person(s) and address(es) as City shall provide to Contractor. Article 3. Contract Time and Liquidated Damages 3.1 Contract Time. The Contract Time will corrurience to run on the date indicated in the Notice to Proceed. City may give a Notice to Proceed at any time within 30 Days after the Notice of Award. Contractor shall not do any Work at the Site prior to the date on which the Contract 'Time commences to run. Contractor shall achieve Substantial Completion within 122 Calendar Davs ,and Final Completion of the entire Work and be ready for Final Payment in accordance with Section 00700 (General Conditions) within 152 Calendar Davs from the date when the Contract Time commences to run as provided in Document 00700 (General Conditions) City of Cupertino 00520 - 1 Contract Sterling Barnhart Park Project No. 2008-9126 3.2 Liquidated Damaees. City and Contractor recognize that time is of the essence of this Contract and that City will suffer financial loss in the form of contract administration expenses (.such as project management and consultant expenses), if all or any part of the Work is not completed within the times specified above, plus any extensions thereof allowed in accordance with the Contract Documents. Consistent with Document 00700 (General Conditions), Contractor and City agree that because of the nature of the Project, it would be impractical or extremely difficult to fix the amount of actual damages incurred by City because of a delay in completion of all or any part of the Work. Accordingly, City and Contractor agree that as li~3uidated damages for delay Contractor shall pay City: 3.2.1 $500 for each Calendar Day that expires after the time specified herein for Contractor to achieve Substantial Completion as specified above. 3.2.2 $500 for each Calendar Day that expires after the time specified herein for Contractor to achieve Final Completion of the entire Work as specified above. 3.2.3 $5,000 for each occurrence of a violation of Document 00800, Section 1.7 WORK DAYS AND HOURS. 3.2.4 1"hree Months Salary for each Key Personnel named in Contractor's SOQ pursuant to Article 2.G of Document 00450 (Statement of Qualifications for Construction Work) who leaves the Project and/or Contractor replaces at any point before Final Completion, for any reason whatsoever, that Contractor can demonstrate to City's satisfaction is beyond Contractor's control. Liquidated damages shall apply cumulatively and, except as provided below, shall be presumed to be the damages suffered by City resulting from delay in completion of the Work. Contractor should be aware that California Department of Fish and Game, and other State and Federal agencies, may also levy fines and penalties for the harming, harassing or killing of protected wildlife and endangered species. Contractor hereby agrees to become familiaz with and adhere to wildlife and endangered species protection requirements. 3.3 Liquidated damages for delay shall only cover administrative, overhead, interest on bonds, and general loss of public use damages suffered by City as a result of delay. Liquidated damages shall not cover the cost of completion of the Work, damages resulting from defective Work, lost revenues or costs of substitute facilities, or damages suffered by others who then seek to recover their damages from City (for example, delay claims of other contractors, subcontractors, tenants, or other third-parties), and defense costs thereof. Article 4. Contract Sum 4.1 City shall pay Contractor the Contract Sum for completion of Work in accordance with Contract Documents as set forth in Contractor's Bid, attached hereto: Sec; Exhibit "A" attached City of Cupertino 00520 - 2 Contract Sterling Barnhart Park Project No. 2008-9126 Article 5. Contractor's Representations In order to induce City to enter into this Contract, Contractor makes the following representations and warranties: 5.1 Contractor has visited the Site'and has examined thoroughly and understood the nature and extent of the Contract Documents, Work, Site, locality, actual conditions, as-built conditions, and all local conditions, and federal, state and local laws and regulations that in any manner may affect cost, progress, performance or furnishing of Work or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Contractor and safety precautions and programs incident thereto. 5.2 Contractor has examined thoroughly and understood all reports of exploration and tests of subsurface conditions, as-built drawings, drawings, products specifications or reports, available for Bidding purposes, of physical conditions, including Underground Facilities, which are identified in Document 00320 (Geotechnical Data, Hazardous Materials Surveys and Existing Conditions), or which may appear in the Drawings. Contractor accepts the determination set forth in these Documents and Document 00700 (General Conditions) of the limited extent of the information contained in such materials upon which Contractor may be entitled to rely. Contractor agrees that except for the information so identified, Contractor does not and shall not rely on any other information contained in such reports and drawings. 5.3 Contractor has conducted or obtained and has understood all such examinations, investigations, explorations, tests, reports and studies (in addition to or to supplement those referred to in Section 5.2 of this Document 00520) that pertain to the subsurface conditions, as-built conditions, underground facilities, and all other physical conditions at or contiguous to the Site or otherwise that may affect the cost, progress, performance or furnishing of Work, as Contractor considers necessary for the performance or fiu~nishing of Work at the Contract Sum, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of Document 00700 (General Conditions); and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by Contractor for such purposes. 5.4 Contractor has correlated its knowledge and the: results of all such observations, examinations, investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents. 5.5 Contractor has given City prompt written notice of all conflicts, errors, ambiguities, or discrepancies that it has discovered in or among the Contract Documen~s and as-built drawings and actual conditions and the written resolution thereof through Addenda issued by City is acceptable to Contractor. 5.6 Contractor is duly organized, existing and in good standing under applicable state law, and is duly qualified to conduct business in the State of California. 5.7 Contractor has duly authorized the execution, delivery and performance of this Contract, the other Contract Documents and the Work to be performed herein. The Contract Documents do not violate or create a default under any instrument, contract, order or decree b::nding on Contractor. 5.8 Contractor has listed Subcontractors pursuant to the Subcontractor Listing Law, California Public Contracting Code §4100 et seq. in document 00340 (Subconti-actors List) Article 6. Contract Documents 6.1 Contract Documents consist of the following documents, including all changes, addenda, and modifications thereto: Document 00400 Bid Form Document 00430 Subcontractors List Document 00450 Statement of Qualifications Document 00460 Schedule of Major Equipment and Materials Suppliers Document 00481 Non-Collusion Affida•/it City of Cupertino 00520 - 3 Contract Sterling Barnhart Park Project No. 2008-9126 Document 00482 Bidder Certifications Document 0051 O Notice of Award Document 00520 Contract Document 00530 Insurance Forms Document 00550 Notice to Proceed Document 00610 Construction Performance Bond Document 00620 Construction Labor and Material Payment Bond Document 00630 Guaranty Document 00650 Agreement and Release of Any and All Claims Document 00660 Substitution Request Form Document 00680 Escrow Agreement for Security Deposit in Lieu of Retention Document 00700 General Conditions Document 00800 Special Conditions Document 00821 Insurance Document 00822 Apprenticeship Program Technical Specification/Special Provisions Addenda(s) Drawings/Plans 6.2 There are no Contract Documents other than those listed in this Document 00520, Article 6. Document 00320 (Geotechnical Data, Hazardous Material Surveys and Existing Conditions), and the information supplied therein, are not Contract Documents. The Contract Documents may only be amended, modified or supplemented as provided in Document 00700 (General Conditions). Article 7. Miscellaneous 7.1 Terms used in this Contract are defined in Docuument 00700 (General Conditions) and will have the meaning indicated therein. 7.2 It is understood and agreed that in no instance a:re the persons signing this Contract for or on behalf of City or acting as an employee, agent, or representative of City, liable on this Contract or any of the Contract Documents, or upon any warranty of authority, or otherwise, and it is Further understood and agreed that liability of the City is limited and confined do such liability as authorized or imposed by the Contract Documents or applicable law. 73 Contractor shall not assign any portion of the Contract Documents, and may subcontract portions of the Contract Documents only in compliance with the Subcontractor Listing Law, California Public Contracting Code §4100 et seq. 7.4 The Contract Sum includes all allowances (if any). 7.5 In entering into a public works contract or a subcontract to supply goods, services or materials pursuant to a public works contract, Contractor or Subcontractor offers and agrees to assign to the awarding body all rights, title and interest in and to all causes of action it niay have under Section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time City tenders final payment to Contractor, without further acknowledgment by the parties. 7.6 Copies of the general prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Contract, as determined by Director of the State of California Department of Industrial Relations, are deemed included in the Contract Documents and on file at City's office, or may be obtained of the State of California web site http://www.dir.ca.gov/DLS:L2/PWD/Northem.html and shall be made available to any interested party on request. Pursuant to Section 1861 of the Labor Code, Contractor represents that it is aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and City of Cupertino 00520 - 4 Contract Sterling Barnhart Park Project No. 2008-9126 Contractor shall comply with such provisions before commencing the performance of the Work of the Contract Documents. 7J Should any part, temZ or provision of this Contract or any of the Contract Documents, or any document required herein or therein to be executed or delivered, be declared invalid, void or unenforceable, all remaining parts, terms and provisions shall remain in full force' and effect and shall in no way be invalidated, impaired or affected thereby. If the provisions of any law causing such invalidity, illegality or unenforceability may be waived, they are hereby waived to the end that Uus Contract and the Contract Documents may be deemed valid and binding contracts, enforceable in accordance with their terms to the greatest extent permitted by applicable law. In the event any provision not otherwise in~~luded in the Contract Documents is required to be included by any applicable law, that provision is deemed included herein by this reference(or, if such provision is required to be included in any particular portion of the Contract Documents, that provision is deemed included in that portion). 7.8 This Contract and the Contract Documents shat be deemed to have been entered into in the County of Santa Clara, State of California, and governed in all respects by California law (excluding choice of law rules). The exclusive venue for all disputes or litigation hereunder shall be in Santa Clara County. Both parties hereby waive their rights under California Code of Civil Procedure Secrion 394 to Fle a motion to transfer any action or proceeding arising out of the Contract Documents to another venue. Contractor accepts the Claims Procedure in Document 00700, Article 12, established under the California Govei~nient Code, Title 1, Division 3.6, Part 3, Chapter 5. 7.9 Contractor and all subcontractors shall comply with the Uniform Administrative Requirements for State and Local Governments set forth in the Code of Federal Regulations (CFR), Title 49, Part 18. In addition, the Contractor agrees to comply with the cost principles and procedures set forth in Office of Management and Budget Circular A-87. The Contractor agrees that a reference to either Office of Management and Budget (OMB) Circular A-87of the Code of Federal Regulations, Title 49, Chapter 1, Part 31, whichever is applicable, and the Code of Federal Regulations, Title 49, fart 18, will be included in any subcontracts entered into as a result of this contract. City of Cupertino 00520 - 5 Contract Sterling Barnhart Park Project No. 2008-9126 /~O ~ ~~~~~'~~3 I1V WITNESS WHEREOF the parties have executed this Contract in quadruplic the day a year us a ove wrltten. STERLI 7~ART P ~ CITY: 9~N CTO CITY OF CUPERTINO, a Municipal Corpora a EIIt Landsc i c. State of California . By: __ [Signature] Attest: City Cle~ Kimberly S h r~~~~j Approved as to form by City Attorney: -~ j / ~q City Attorney: Carol Korade I hereby certify, under penalty of perjury, that David W. Knapp, City Manager of the City of Cupertino was duly authorized to execute this document on behalf of the City of Cupertino. G~ y s-~ak~~~ [Please print na ere Title: i ' [If Co oration firma resident, or Vice President] By: [Signa/tore] ~^3)Vy S~OC~r:~~ [Please profit name here] Title: ~P~~~f~/ [If Corporation: Secretary, ?assistant Secretary, Chief Financial Officer, or Assistant Treasurer] 2. ZS• Ca ~~.s~ ~S ~~~' David W. Knapp, City Manager o the City of Cupertino, a Municipal Corporation of the State of California Designated Representative: Name: Terry W. Greene, AIA Title: City Architect Address: 10300 Torre Ave., Cupertino, CA 95014 Phone: 408-777-3354 Facsimile: 408-777-3333 AMOUNT: $ 364,345.00 ~\ ACCOUNT NiIMBER:420-9126-93 ~~ ~j~~t) ] FILE NO.: 92,070 / 6 ~ SSa 1 ~, i3r Cis c z ~ ~9 p3 ~( State Contractor's License No. Classification S/~ t /i o Expiration Date Taxpayer ID No. ~ ~ - Q~ 7 l]~~ / Name: ~~~''+/i1~ !~'i ~r'Y~,SC(GOilia~ ~ri C Title: C~ ~ `i S-E«~~o TI o(Pt~ ~~S i ~cn0` Address: ~/i~'/7Z\~~U/~iL~ ~t/P ~v~5r C~-~'/~IZ Phone: 559 )\ ZU~IZ-7~6gC~ Facsimile: ~~` J / ~~- ~ 7g NOTARY ACKNOLEDGEMENT IS REQUIRED. IF A CORPORATION, CORPORATE SEAL AND CORPORATE NOTARY ACKNOWLEDEMENT AND FEDERAL TAX ID ARE REQUIRED. IF NOT A CORPORATION SOCIAL SECURITY NO. IS REQUIRED END OF DOCUMENT City of Cupertino 00520 - 6 Contract Sterling Barnhart Park CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California County of Fre nno ~/~~G~ On ~X~~.~~-~- ~~/ r/ ~ / -before me, Jiil L. Stockbridge, Notary Public, personally appeared Guv Stockbricgge , . JILL L. STOCKBRIDGE "~' Commission # 7 69861 5 a =-eiw Notary Public -California £ `~ ~ Fresno County MY Comm. Expires Nov 8, 207 O who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executecl the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executecl the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITN S, _ and an offic" se'al/. / ~C! U r OPT/OI{(A Though the information be/ow is not required by law, it may prove va/uab/e to parsons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above:. Capacity(ies) Claimed by Signer Signer's Name: Guv Stockbridge ^ Indi ual orporate Officer -Title(s): President ^ Partner - O Limited O General ^ Attorney-in-Fact ^ Trustee ^ Guardian or Conservator ^ Other: Signer is Representing: Elite Landscaoing. Inc. ~~!-HIBIT A Project No. 2008-9126 DOCU1vII?NT 00400 BII) FORM To be submitted as part of Envelope "A" by the time and date specified in Document 00200 (Instructions to Bidders). TO THE HONORABLE CITY COUNCIL OF THE C[TY OF CUPERTINO THIS BID IS SUBMITTED BY: ~i r-Fer ~ ~ .~ ca v,~rpt t ~ ~ irntL ompany Name) Project Ho. 2008-9126 STERLING B~-RNFTART PARK 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into a contract with the City of Cupertino ("City") in the form included in the Contract Documents, Document 00520 (Contract), to perform and firniish all Work as specified or indicated in the Contract Documents for the Contract Sum and within the Contract Time indicated in this Bid and in accordance with all other terms and conditions of the Contract Documents. All portions of this Bid Forth must be completed and signed before the bid is submitted. Failure to do so will result in the bid being rejected as non-responsive. 2. Bidder accepts all of the terms and conditons of the Contract Documents, Document 00100 (Advertisement £or Bids), and Document 00200 (Instructions to Bidders), including, without limitaton, those dealing with the disposition of Bid Security. This Bid will remain subiect to acceptance for 90 Calendar Dav fter the day of Bid ogenine. 3. Bidder has visited the Site and performed all tasks, research, investigation, reviews, examinations, and analysis and given notices, regarding the Project and the Site, as set forth in Document 00520 (Contract), Article 5. 4. Bidder has given City prompt written notice of all conflicts, errors, ambiguities, or discrepancies that it has discovered in or among the Contract Documents and as-built drawings and actual conditions and the written resolution thereof through Addenda issued by City is acceptable to Contractor. 5. Subcontractors for work included in all Bid items, in accordance with the criteria in the Public Contract Code, are listed on the attached Document 00430 (Subcontractors List). 6. The undersigned Bidder understands that City reserves the right to reject this Bid. 7. If written notice of the acceptance of this Bid, hereinafter referred to as Notice of Award, is mailed or delivered to the undersigned Bidder within the time described in paragraph 2 of this Document 00400 or at any other time thereafter before it is withdrawn, the undersigned': Bidder will execute and deliver the documents required by Document 00200 (Instructions to Bidders) within the times specified therein_ These documents include, but are not limited to, Document 00520 (Contract), Document 0061 O (Conatntction Performance Bond), and Document 00620 (Construction Labor and Material Payment :Bond). 8. Notice of Award or request for additional information may be addressed to the undersigned Bidder at the address set forth below on the signature page. 10. The undersigned Bidder herewith encloses cash, a cashier's check, or certified check of or on a responsible bank in the United States, or a corporate surety bald furnished by a surety authorized to do a surety business in City of Cupertino Bid Form Sterling Barnhart Park 00400 - 1 ty Project No. 2008-9126 the State of California, in form specified in Document 00200 (Instructions to Bidders), in the amount of ten percent (10%) of the total of Bid and made payal:~le to the "City of Cupertino". 11. The undersigned Bidder agrees to commence Work under the Contract Documents on the date established in Document 00700 (General Conditions) and to complete all work within the time specified in Document 00520 (Contract). The undersigned Bidder acknowledges that City has reserved the right to delay or modify the commencement date. The undersigned Bidder further acknowledges City has reserved the right to perform independent work at the Site, the extent of such work may not be determined until after the opening of the Bids, and that the undersigned Bidder will be required to cooperate with such other work in accordance with the requirements of the Contract Documents. 12. The undersigned Bidder agrees that, in accordance with Document 00700 (General Conditions), liquidated damages for failure to complete all Work in the Contract within the time specified in Document 00520 (Contract) shall be as set forth in Document 00520 (Contract). City of Cupertino Bid Form Starling Barnhart Park 00400 - 2 I i ;' Project No. 2008-9126 SCI3EDULE OF BID PRICES All Bid items, including lump sums and unit prices, must be Slled in completely. Allowances and Alternative Bid items are described in Document 00800 (Special Conditions). Quote in figures and words are specifically requested. Specialty Items are identified on the Bid Form in the description. BASE BID ITEM ~ D ESCRIPTSON; t71VTr ''EST 3 - '~TA Z'AY $ . _ , Park Improvements per Plans &c Specifications LS 1 ~ ~ y L / S+ 2 Additional Landscaping Enhancements AL na $5,000 3 Additional Fence Work AL na $10,000 `t Additional Site Signage and Furnishings ,~, na $5,000 TOTAL BASE B]CD PRICE ~~j Cf ~ Tota! Base Bid Price: _7h~r~ .h~i~rs~-l ~ ~Si~f s I ~ r ~f~.~~r ~> ~/ ~fjv=G~ /Zi:>~~/i ~I~r~~-~ ' (Words) Unit Legend LS =Lump Sum AL ° Allowance EA ° Each SF =Square Feet LF =Linear Feet TON =Ton or 2,000 Pounds CY =Cubic Yards LB =Pounds ALTERNATE Alternate ~. =~~ ~` DESCRIPTION: ~ ; = UNIT' .I.~, ADD r CREDTT Tn'lt'AL ~`.' 1 Install Basketball Court per Plans ~& LS 1 ~~ Specifications f~, S,3 Q TOTAL ALTERNATE ' Total Add Alternate Price: ~~5~-~~r~ ~~n%~--~~/ . ~/vim tui~ er/~-/ ~f ~h~~- G~fJ//~'r.~-~ (~'Vords) City of Cupertino Bid Form Sterling Barnhart Park 00400 - 3 Project No. 2008-9126 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUMS Bidder herby acknowledges receipt and examination of all Contract Documents and the following Addenda: Addendum No. Addendum Date r n Zq o 9 v t o9 Bidder proposes and agrees to fully perform the Work within the time stated and in strict accordance with the Contract Documents for the sums of money listed in this Bid Form. NAME OF BIDDER: licensed in accordance with ct for the registration of C~ntra.ctors, and with License number: ~ ~S°~ ~ Expiration Date• r/`•~`~~~i (~~l ~ ryo Where incorporated, if applicable ~t' ~r~~- ~~~'~~ ~~~ Princip I certify (or declare) under penalty of perjury under the laws of the is true and correct. Signature o idler NOTE: If Bidder is a corporation, set forth the legal name of the corporation, state where incorporated, together with the signature of the officer or officers authorized to sign contx•~w-ts on behalf of the corporation. If Bidder is a parhiership, set forth the name of the firm together with the signature of the partner or partners authorized to sign contracts on behalf of the partnership. Business Address: ~f_yj 7Z ~ ~,~~~, ~'~,~ lld v ~ l.a- ~-J'~-6!Z Officers authorized to sign contracts: ~` y s~~~.~.~ ~~C _ f ~~c-7~ Typed F 1 Telephone Number(s): ~~~ ~9Z_ ~7,~G _ `. Fax Number(s): ~~~ ) 7 ~~- (/ O / E-MailAddress: ~j-~+1n'~Ct~~? L[~/ut~~~il•~c~~ END OF I>OCiTMENT City of Cupertino Bid Form Sterling Barnhart Park 00400 - 4 Project No. 2008-9126 DOCU1\~NT 00430 REQUIRED SUBCONTRACTORS LIST Bidder must provide the following Listed Subcontractor information in conformance with the California Public Contract Code where the value of the Subcontractor's work is or exceeds Yz of one percent (.OS%) of the Bid on Document 00400. Failure to do so will render Bid Non Responsive. Bidder is reminded that Listed Subcontractors cannot be substituted by the Apparent Low Bidder after Bid has been submitted and opened, without City's formal approval. Subcontractor Name Address 8c Phone No. License No. Trade $ Value $ l9 7'L iii kiij ° 3~ ' L !f a _.~ ~G<~L~-j 710 ~S2- Zo-~ `i_ v~~Gt ~'Ci.. . /cam- '~(~ e.? / ~fzOSf L~J/'~Ji .$"G S/ G" ~°2i53 '3 ti y ~ "L UOy _ . __.._......~._....,_.....x.«.~ ....~..~~~.r VOLUN'T'ARY SUBCONTRACTOR LIST Bidder is requested to voluntarily provide Subcontractor information listed below for subcontract work whose value is less than %z of one percent of the Bid on Document 00400. Failure to do so will have no impact on Bid. Bidder is requested not to substitute Subcontractors after B id has been submitted and opened, without City's infonna2 approval. neressarv END OF DOCUMENT City of Cupertino 0(1430 - 1 Subcontractors List Sterling Barnhart Park Project No. 2008 - 9126 DOCIJMENT 00460 SCHEDULE OF MAJOR EQUIPMENT AND MATERIAL SUPPLIERS The undersigned Bidder represents that, if awarded the Contract, the items of major equipment and materials specified below will be supplied by the manufacturers or suppliers ::pecified below. By so indicating, bidder warrants that the equipment and materials manufactured and/or supplied by the named manufacturer or supplier will be provided on the Project unless review of submittal information or performance under tests reveals that the equipment or material does not meet Contract requirements or is no longer available. Fai] ure to acknowledge this schedule may render the Bid non- responsive and may be the basis for rejection of the Bid. Material or i ment Su Lier Phone # Play Structures, Swings and Equipment ~ ~ 1 b~S CI"~pt~YVy~+ -~ TVA' S'c7~•~~C) Picnic Tables, Game Tables, 8c Trash Receptacles Drinking Fountain s 7 ~e~x~i~~~ ~ri%t/~ ~~T'ir~ •5s 2 - ~.,~3~ Bike Rack ~f)~~~~/ipi.x <~a't> S/5~.~ -793 Benches L~f../~ .SG~zg-~C. ~S -t/2L 3~ ~S~' Pervious Concrete r~~S{s orTli//.~C ~.~•~c~/..~i G /~iCJtilz IXJ- .J-~-3~- / -r ~ Bidder: ~ 1 1' L SIGMA f f 6 ~'~ DA c- END OF DOCUMENT City of Cupertino 00460 -1 Schedule of Major Equipment and Materials Suppliers Sterling Barnhart Park Project No. 2008-9126 DOCUD~NT 00481 NON-COLLUSION AFFIDAVIT PUBLIC CONTRACT CODE §7106 NON-COLLUSION AFFIDAVIT TO BE EXECI:JTED BY BIDDER AND SUBMITTED WITH BID STATE OF CALIFORNIA ) ss. COU~~N^^TY OF F-~~no ) Caw .f~~.~'DlM being first duly sworn~~-~~ d~Poses and says that he or she is ..-,~~ ~ ]Office of Affiiant] of Czi1cG_ ~~y-~ca~ri~..t /roc [Name of Bidder], the party making the foregoing Bid, that the Bid is not made in the interest ot; or on be alf of, any undisclosed person, partnership, company, association, organization, or corporation; that the Bid is genuine and not collusive or sham; that Bidder has not duectly or indirectly induced or solicited any other bidder to put is a false or sham Bid, and has not directly or indirectly colluded, conspired, connived or agreed with any bidder or anyone else to put in a sham Bid, or that anyone shall refrain fiom bidding, and that the Bidder has not in any manner, directly or indirectly, sought by contract, communication or conference with anyone to fix the Bid price of Bidder or any other bidder, or to fix any overhead, profit or cost element of the Bid price, or of that of any other bidder, or to secure any advantage against the City of Cupertino, or anyone interested in the proposed contract; that all statements contained in the Bid are true; and further, that Bidder has not, directly or indirectly, submitted its Bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, Bid depository, or to any member or agent thereof to effectuate a collusive or sham Bid. Executed under penalty of perjury under the laws of the Stzite o~rf-C-~a~~lif//ornia: U~i~ C it s2~ (Nance ofBidd (Signature ofPn Subscribed and sworn before me This day of , 2009 Notary Public of the State of 7n and for the County of My Commission expires- (Seal) (If Bidder is a parh~ership or a joint venture, this e~davit must be signed and sworn to by every member of the partnership or venture.) (If Bidder [including any partner or venturer of a partnership or joint venture] is a corporation, this affidavit must be signed by tha Chairman, President, or Vice President and by the Secretary, Assistant Secretary, Chief Financial Officer, or Assistant Treasurer.) (If Bidder's affidavit on this form is made outside the State of California, the otlicial position of the person taking such affidavit shall be certified according to law.) END OF DOCUMENT City of Cupertino 00481 - 1 Non-Collusion Affidavit Sterling Barnhart Park Jurat State of California County of ~'~c e.Erra-~ Subscribed and sworn to (or affirmed) before me on this ~17~r~ day of `n~y e-N`^V~-~- , 20 ~ `y by proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. Signature ~~~ seat) _ Y JENNIFER L XYDE Commlaabn ^17Y3'1~3 v Mahry PteLNe-Cafifornla _v fmno COttIMy My Corrrw. E~1/as l~a•dr 30, 7012 OPTIONAL INFORMATION DESCRIPTION OF THE ATTACHED DOCUMENT (Tifle or description of attached document) ("Title or description ofatteched document continued) Number of Pages Document Date (Additional information) INSTRUCTIONS FOR COMPLETING THIS FORM 73~e wording of aTT Trusts completed in CaltforMa gJter January I, 2008 must be to the form as sefjorth within this Jtont T7rars are no exeptlorrr. ;j'a Just to ba completed does not joTlaw thts form, the notary mart corrsct the varbtaga by using a,/urat starxp tmntatntng the correct wording or attaching a saoarate Just faro: such as this arse which does contain proper wording In ac'ditfon, the notary must require an oath or c~irmatton from the docwneru sttmar regardGrg the lrutltfirlness of the contents of the document Tyra dcctansn[ muss be signed AFTER the oath or ¢fJtrnratfon. u'the document was previously signed, it must ba ra.rigned fn front of the notary public dwtng the ,Jw-at process. • 3tata end County information must be the State sod County where the document signer(s) personally appeared before the notary publio. • Date of notarization must be the date that the signer(s) personally appeared which moat also bo the name date the just process i9 completed, • Print the name(s) of doet~ent signer(s) who personally appear at the time of notarization. • Siir~natura of the notary public must match the signature on file with the oSica of the county clulL • The notary seal impression must be clear and photographically reproducible. Impression moat sot cover te# or lines. IP seal impression smudges, re-seal if a suBtieient area permits, otherwise complete a diPlmmnt just form. 4 Additional information is not required but could help to eaauca this just is not misused ar-attached to a different document. +} Indicate title or type of attached document, mmtber of pages and date. • Securelly attach this docunent to the signed document 2008 Version CAPA v19.07 800-873-9865 wwwNotaryClasses.c:om DOCUMENT: 21104968 Pages: 3 RECORDING REQUESTED BY 111111111111 .. No Fees City of Cupertino I Copies.. --- AMT PAID WHEN RECORDED MAIL TO REGINA ALCOMENDRAS SANTA CLARA COUNTY RECORDER RDE 011 City Clerk's Office Recorded at the request of 3/088 /201 1 City of Cupertino City 2:27 PM 10300 Torre Avenue Cupertino, CA 95014 -3255 (SPACE ABOVE THIS LINE FOR RECORDER'S USE) NO FEE IN ACCORDANCE WITH GOV. CODE 27383 CERTIFICATE OF COMPLETION ANI) NOTICE OF ACCEPTANCE OF COMPLETION STERLING BARNHART PARK PROJECT 2008 -9126 Original O For Fast Endorsement • 1/ City Hall Irj 10300 Torre Avenue Cupertino, CA 95014 -3255 < �� . '9s s (408) 777 -3354 CUPERTINO PUBLIC WORKS DEPARTMENT CERTIFICATE OF COMPLETION AND NOTICE OF ACCEPTANCE OF COMPLETION STERLING BARNHART PARK PROJECT 2008 -9126 NOTICE IS HEREBY GIVEN THAT I, Timm Borden, Director of Public Works and City Engineer of the City of Cupertino, California, do hereby certify that the work and improvements in hereinafter described in the contract which was entered into, by, and between the City of Cupertino and Elite Landscaping, Inc., December 10, 2009, in accordance with the plans and specifications for said work, have been completed to the City's satisfaction and acceptance of completion was ordered on March 1, 2011. That said work and improvements consisted of furnishing all labor, materials, tools, and equipment required to complete said project, all as more particularly described in the plans and specifications for said project. Director o Public Works and City Engineer of the City of Cupertino Date: March 3, 2011 "NO FEE" VERIFICATION I have reviewed this Certificate of Completion and Notice of Acceptance of Completion. To the best of my knowledge, the information contained herein is true and complete. I verify under penalty of perjury under the laws of the State of California, that the foregoing is true and correct. Executed on the 7th day of March 2011 at Cupertino, California. I 1 4 ' Kirsten Squarcia City Clerk's Office City of Cupertino