Loading...
12-093 Spencon Construction, Inc., Reconstruction Curbs, Gutters, and Sidewalks, Project Number 2012-04Project No. 2012 -04 ��d� CONTRACT THIS CONTRACT, dated this iAOI day of �e rnbeir; 2012 , by and between Spencon Construction, Inc. whose place of business is located at P.O. Box 1220, Danville, CA 94526 ( "Contractor "), and the CITY OF CUPERTINO, a Municipal Corporation of the State of California ( "City ") acting under an virtue of t e ority vested in the City by the laws of the State of California. s WHEREAS, City, on the L9 day of `1,MVst", 2012 awarded to Contractor mg roject: PROJECT NUMBER 2012 -04 RECONSTRUCTION OF CURBS, GUTTERS, AND SIDEWALKS NOW, THEREFORE, in consideration of the mutual covenants hereinafter set forth, Contractor and City agree as follows: Article 1. Work 1.1 Contractor shall complete all Work specified in the Contract Documents, in accordance with the Specifications, Drawings, and all other teams and conditions of the Contract Documents. Article 2. Agency and Notices to City 2.1 City has designated David Stillman, Senior Civil Engineer, to act as City's Authorized Representative(s), who will represent City in performing City's duties and responsibilities and exercising City's rights and authorities in Contract Documents. City may change the individual(s) acting as City's Authorized Representative(s), or delegate one or more specific functions to one or more specific City's Representatives, including without limitation engineering, architectural, inspection and general administrative functions, at any time with notice and without liability to Contractor. Each City's Representative is the beneficiary of all Contractor obligations to City, including without limitation, all releases and indemnities. 2.2 All notices or demands to City under the Contract Documents shall be to City's Authorized Representative at: 10300 Tone Avenue, Cupertino, California 95014 or to such other person(s) and address(es) as City shall provide to Contractor. Article 3. Contract Time and Liquidated Damages 3.1 Contract Time. The Contract Time will commence to run on the date indicated in the Notice to Proceed. City may give a Notice to Proceed at any time within 30 Days after the Notice of Award. Contractor shall not do any Work at the Site prior to the date on which the Contract Time commences to run. Contractor shall achieve Final Completion of the entire Work and be ready for Final Payment in accordance with Section 00700 (General Provisions) no later than June 30, 2013 as provided in Document 00700 (General Provisions) 3.2 Liquidated Damages. City and Contractor recognize that time is of the essence of this Contract and that City will suffer financial loss in the form of contract administration expenses (such as project management and consultant expenses), if all or City of Cupertino 00520- 1 Contract Reconstruction of Curbs, Gutters and Sidewalks Project No. 2012 -04 any part of the Work is not completed within the times specified above, plus any extensions thereof allowed in accordance with the Contract Documents. Consistent with Document 00700 (General Provisions), Contractor and City agree that because of the nature of the Project, it would be impractical or extremely difficult to fix the amount of actual damages incurred by City because of a delay in completion of all or any part of the Work. Accordingly, City and Contractor agree that as liquidated damages for delay Contractor shall pay City: 3.2.1 $75 for each Calendar Day that expires after the time specified herein for Contractor to achieve Final Completion of the entire Work as specified above. 3.2.2 $75 per Calendar Day for failure to remove concrete from a work area within the same calendar week. 3.23 $75 per Calendar Day for failure to replace asphalt to finish grade within 30 calendar days. Liquidated damages shall apply cumulatively and, except as provided below, shall be presumed to be the damages suffered by City resulting from delay in completion of the Work. 3.3 Liquidated damages for delay shall only cover administrative, overhead, interest on bonds, and general loss of public use damages suffered by City as a result of delay. Liquidated damages shall not cover the cost of completion of the Work, damages resulting from defective Work, lost revenues or costs of substitute facilities, or damages suffered by others who then seek to recover their damages from City (for example, delay claims of other contractors, subcontractors, tenants, or other third - parties), and defense costs thereof. Article 4. Contract Sum 4.1 City shall pay Contractor the Contract Sum for completion of Work in accordance with Contract Documents as set forth in Contractor's Bid, attached hereto: See Exhibit "A" attached Article 5. Contractor's Representations In order to induce City to enter into this Contract, Contractor makes the following representations and warranties: 5.1 Contractor has visited the Site and has examined thoroughly and understood the nature and extent of the Contract Documents, Work, Site, locality, actual conditions, as- built conditions, and all local conditions, and federal, state and local laws and regulations that in any manrier may affect cost, progress, performance or furnishing of Work or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Contractor and safety precautions and programs incident thereto. 5.2 Contractor has examined thoroughly and understood all reports of exploration and tests of subsurface conditions, as -built drawings, drawings, products specifications or reports, available for Bidding purposes, of physical conditions, including Underground Facilities, or which may appear in the Drawings. Contractor accepts the determination set forth in these Documents and Document 00700 (General Provisions) of the limited extent of the information contained in such materials upon which Contractor may be entitled to rely. Contractor agrees that except for the information so identified, Contractor does, not and shall not rely on any other information contained in such reports and drawings. 5.3 Contractor has conducted or obtained and has understood all such examinations, investigations, explorations, tests, reports and studies (in addition to or to supplement those referred to in Section 5.2 of this Document 00520) that pertain to the subsurface conditions, as -built conditions, underground facilities, and all other physical conditions at or contiguous to the Site or otherwise that may affect the cost, progress, performance or furnishing of Work, as Contractor considers necessary for the performance or furnishing of Work at the Contract Sinn, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of Document 00700 (General Provisions); and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by Contractor for such purposes. City of Cupertino 00520-2 Contract Reconstruction of Curbs, Gutters and Sidewalks Project No. 2012 -04 5.4 Contractor has correlated its knowledge and the results of all such observations, examinations, investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents. 5.5 Contractor has given City prompt written notice of all conflicts, errors, ambiguities, or discrepancies that it has discovered in or among the Contract Documents and as -built drawings and actual conditions and the written resolution thereof through Addenda issued by City is acceptable to Contractor. 5.6 Contractor is duly organized, existing and in good standing under applicable state law, and is duly qualified to conduct business in the State of California. 5.7 Contractor has duly authorized the execution, delivery and performance of this Contract, the other Contract Documents and the Work to be perfonned herein. The Contract Documents do not violate or create a default under any instrument, contract, order or decree binding on Contractor. 5.8 Contractor has listed Subcontractors pursuant to the Subcontractor Listing Law, California Public Contracting Code §4100 et seq, in document 00340 (Subcontractors List) Article 6. Contract Documents 6.1 Contract Documents consist of the following documents, including all changes, addenda, and modifications thereto: Document 00002 Signature Page Document 00003 Project Directory Document 00012 Caltrans /City Cross - Reference Table Document 00100 Advertisement For Bids Document 00200 Instructions to Bidders Document 00210 hndemnity and Release Agreement Document 00400 Bid Form Document 00411 Bond Accompanying Bid Document 00430 Subcontractors List Document 00450 Statement of Qualifications Document 00481 Non - Collusion Affidavit Document 00482 Bidder Certifications Document 00520 Contract Document 00530 Insurance Forms Document 00610 Construction Performance Bond Document 00620 Construction Labor and Material Payment Bond Document 00630 Guaranty Document 00650 Agreement and Release of Any and All Claims Document 00660 Substitution Request Form Document 00700 General Conditions Document 00800 Special Conditions Document 00820 Traffic Control Requirements Document 00821 Insurance Document 00822 Apprenticeship Program Technical Specifications Addenda(s) Drawings/Plans 6.2 There are no Contract Documents other than those listed in this Document 00520, Article 6. The Contract Documents may only be amended, modified or supplemented as provided in Document 00700 (General Provisions). City of Cupertino 00520-3 Contract Reconstruction of Curbs, Gutters and Sidewalks Project No. 20I2 -04 Article 7. Miscellaneous 7.1 Terns used in this Contract are defined in Document 00700 (General Provisions) and will have the meaning indicated therein, 7,2 It is understood and agreed that in no instance are the persons signing this Contract for or on behalf of City or acting as an employee, agent, or representative of City, liable on this Contract or any of the Contract Docrnnents, or upon any warranty of authority, or otherwise, and it is further understood and agreed that liability of the City is limited and confined to such liability as authorized or imposed by the Contract Documents or applicable law. 7.3 Contractor shall not assign any portion of the Contract Documents, and may subcontract portions of the Contract Documents only in compliance with the Subcontractor Listing Law, California Public Contracting Code §4100 et seq. 7.4 The Contract Sum includes all allowances (if any). 7.5 In entering into a public works contract or a subcontract to supply goods, services or materials pursuant to a public works contract, Contractor or Subcontractor offers and agrees to assign to the awarding body all rights, title and interest in and to all causes of action it may have under Section 4 of the CIayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time City tenders final payment to Contractor, without further acknowledgment by the parties. 7.6 Copies of the general prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Contract, as determined by Director of the State of California Department of Industrial Relations, are deemed included in the Contract Documents and on file at City's office, or may be obtained of the State of California web site http:// www. dir .ca,gov /DLSR/PWD/Northem.btral and shall be made available to any interested party on request. Pursuant to Section 1861 of the Labor Code, Contractor represents that it is aware of the provisions of Section. 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self - insurance in accordance with the provisions of that Code, and Contractor shall comply with such provisions before commencing the performance of the Work of the Contract Documents. 7.7 Should any part, tern or provision of this Contract or any of the Contract Documents, or any document required herein or therein to be executed or delivered, be declared invalid, void or unenforceable, all remaining parts, terms and provisions shall remain in full force and effect and shall in no way be invalidated, impaired or affected thereby. If the provisions of any law causing such invalidity, illegality or unenforceability may be waived, they are hereby waived to the end that this Contract and. the Contract Documents may be deemed valid and binding contracts, enforceable in accordance with their terms to the greatest extent permitted by applicable law. In the event any provision not otherwise included in the Contract Documents is required to be included by any applicable law, that provision is deemed included herein by this reference(or, if such provision is required to be included in any particular portion of the Contract Documents, that provision is deemed included in that portion). 7.8 This Contract and the Contract Documents shall be deemed to have been entered into in the County of Santa Clara, State of California, and governed in all respects by California law (excluding choice of law rules). The exclusive venue for all disputes or litigation hereunder shall be in Santa Clara County. Both parties hereby waive their rights under California Code of Civil Procedure Section 394 to file a motion to transfer any action or proceeding arising out of the Contract Documents to another venue. Contractor accepts the Claims Procedure in Document 00700, Article 12, established under the California Government Code, Title 1, Division 3.6, Part 3, Chapter 5. City of Cupertino 90520.4 Contract Reconstruction of Curbs, Gutters and Sidewalks Project No. 2012 -04 IN WITNESS WHEREOF the parties have executed this Contract in quadruplicate the day and year first above written. RECONSTRUCTION OF CURBS, GUTTERS AND SIDEWALKS PROJECT 2012 -04 CITY: , CONTRACTOR: CITY OF CUPERTINO, a Municipal Corporation of the State of California r C) B [Signature] Attest: re,�, [Please print name here] City Clerk: Grace Schmidt A ro ed as fo n by City Attorney: Title: [If Corporation: ,in, Pre ' t, or Vice President] City Attorney: : Carol Korade B [Signature] I hereby certify, under penalty of perjury, that Timm Borden, Director of Public Works of the City of Cupertino was duly authorized to execute this document. Dated: -1 " [Please print name here] Title: 1T -: a �r [If Corporation: Secretary, Assistant Secretary, Chief Financial Officer, or Assistant Treasurer] � Zo A- State Contractor's License No. Classification Timm. rden, Director of Public Works of the City of Expiration Date Cupertino, a Municipal Corporation of the ,State of California Designated Representative: Name: David Stillman Title: Senior Civil Engineer Address: 10300 Torre Ave., Cupertino, CA 95014 Phone: 408- 777 -3354 Facsimile: 408-777-3333 AMOUNT: $163,196.00 ACCOUNT NUMBER: 270U51--9-300 FILE NO.: 50,349.00 �� dy City of Cupertino Reconstruction of C Gutters and Sidewalks Taxpayer ID No. '2 5 ' 0 3 Name:��71t. Address: Gtr_ 2�Q�J Phone: -1 q 23 t_ - Facsimile: NOTARY ACIC'TOLEDGEMENT IS REQUIRED. IF A CORPORATION, CORPORATE SEAL AND CORPORATE NOTARY ACI0;OWLEDEMEN1" AND FEDERAL TAX ID ARE REQUIRED. IF NO'I A CORPORATION SOCIAL SECURITY NO. IS REQUIRED END OF DOCUMENT 00520-5 Contract Q i ���' C.�S State of California County of /ti -I6 (f��% personally appeared who proved to me on the basis of satisfactory evidence to be the person) whose name) isleeb subscribed to the within ipstrument and .acknowledged to me that he /p6e/ey executed the same in his /Vrl Keir authorized capacityQos), and that by his /Vr /t eir signature (s) on the MONICA OF�RA instrument the person), or the entity upo behalf of 4130 which the person() adted, executed the instrument. ALIFORNIA COUNTY L 2, 2016 1 certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature Place Notary Seal Ahcve Signatur of Notary Publk: OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s). Signer's Name: ❑ Individual ❑ Corporate Officer —Title(s): 1' 't d 71 fl- I Number of Pages: Signer's Name: ❑ Individual ❑ Corporate Officer — Title(s): ❑ Partner --- ❑ Ill a enera _ ❑Partner — ❑Limited ❑General _ ❑ Attorney in Fact "• ❑ Attorney in Fact • ❑ Trustee Top of thumb here I-] Trustee Top of thumb here ❑ Guardian or Conservator ❑ Guardian or Conservator ❑ Other: ❑ Other: Signer Is Representing: Signer Is Representing: ® 2047Nattonal Notary Assocfatlon• 9350Do Soto Ave. ,P.O.Box2442•Chatsworth,CA ill 313 -2462• www.NaUonalNotaTyorg Item #5907 Reorder. Call Tol!- Free1- 800 - 878-8827 RECORDING REQUESTED BY City of Cupertino WHEN RECORDED MAIL TO City Clerk's Office City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 -3255 NO FEE INACCORDANCE WITH GO V. CODE 2 73 83 DOCUMENT: 22132167 1111 lill 111111111111111111111111 REGINA ALCOMENDRAS SANTA CLARA COUNTY RECORDER Recc:rded at the request of City Pages: 3 Fees.... No Fees Taxes... Copies.. AMT PAID RDE # 009 3/13/2013 3:22 PM (SPACE ABOVE THIS LINE FOR RECORDER'S USE) CERTIFICATE OF COMPLETION AND NOTICE OF ACCEPTANCE OF COMPLETION RECONSTRUCTION OF CURBS, GUTTERS AND SIDEWALKS CITY PROJECT NUMBER 2012 -04 Original O For Fast Endorsement "NO FEE" VERIFICATION I have reviewed this Certificate of Completion and Notice of Acceptance of Completion. To the best of my knowledge, the information contained herein is true and complete. I verify under penalty of perjury under the laws of the State of California, that the foregoing is true and correct. Executed on the 13ffi March, 2013 at Cupertino, C=alifornia. Kirsten Squarcia Deputy City Clerk City of Cupertino CUPERTINO City Hall 10300 Torre Avenue Cupertino, CA 95014 -3255 (408) 777 -3354 PUBLIC WORKS DEPARTMENT CERTIFICATE OF COMPLETION ANI) NOTICE OF ACCEPTANCE OF COMPLETION RECONSTRUCTION OF CURBS, GUTTERS AND SIDEWALKS CITY PROJECT NUMBER 2012 -04 NOTICE IS HEREBY GIVEN THAT I. Timm Borden, Director of Public Works and City Engineer of the City of Cupertino, California, do hereby certify that the work and improvements for the reconstruction of curbs, gutters and sidewalks performed at various location in Cupertino, California, in hereinafter described in the contract which was entered into, by, and between the City of Cupertino and Spencon Construction, Inc., September 4, 2012, in accordance with the plans and specifications for said work, have been completed to the City's satisfaction and acceptance of completion was ordered on February 27, 2013. That said work and improvements consisted of furnishing all labor, materials, tools, and equipment required to complete said project, all as more particularly described in the plans and specifications for said project. or of Public Works and City Engineer of the City of Cupertino Date: March 11, 2013